All writing
Management November 24, 2026

The Human Parts Got More Important

Part 2 of After the Org Chart, a series about managing engineering teams while AI changes the job. Start from the beginning with The Middle Is Getting Squeezed.

AI took a lot of work off my plate this year. None of it was the hard part.

It writes the status rollups, summarizes the retro, and drafts the planning docs. It has no idea that the engineer who didn't talk in that retro is thinking about quitting. That part of the job didn't shrink. If anything it got bigger.

The manager job got more fractured

Engineering jobs have changed a lot in the last year. How code gets written, reviewed, and shipped looks different on most teams now. The manager job mostly hasn't caught up. A lot of it is still stuck in status updates and chasing threads, a Slack channel here, a PR there, a doc someone tagged you in, trying to work out which one actually needs you.

And there are more threads than ever. When the team ships faster, everything around the work multiplies with it, more PRs and more pings. The manager used to be the single point that held all of that together. Now that point is split across more tools and conversations than it's ever been.

An agent can take some of that noise. It can sort the threads, summarize the channel, and tell you which PR has been sitting for three days. The human part is still what holds up the walls. Some days it's the floor that feels like sludge.

What didn't get automated

Two senior engineers who disagree about an architecture call and have stopped talking to each other. Someone who has been off for three weeks and won't say why, or has a parent in the hospital, or just found out their role is changing and is pretending it's fine. (I wrote a whole runbook for the worst version of this stuff, because it's the part nobody trains you for.)

None of that shows up in a dashboard, and none of it gets better because the code ships faster.

Why it matters more now

Teams are smaller, so one person having a rough month is a bigger share of the team than it used to be. The pace is faster, so burnout shows up sooner. And almost everyone in this industry is anxious about where it's going, which I'll get into in the next post in this series.

So if the tools gave you back five hours a week, this is where those hours go.

What that looks like day to day

1:1s that aren't status meetings. The status is already in the tool. Use the time for the person. Ask how they're actually doing and then sit through the awkward pause long enough to get a real answer.

Notice when something changes. The engineer who usually argues in design review goes quiet. Camera off for two weeks straight. PRs landing at 1am. Any one of those can be nothing, but a few together usually aren't.

Get to conflict early. Two people who are annoyed with each other in week one are a five minute conversation. In week six it's a transfer request or worse, an exit.

My own 1:1s are where this changed the most. I used to run them like data collection. Laptop open, taking notes on the person and everything they were working on, then pulling themes out of it afterward. Now the laptop stays shut. I still keep a running file on each person, I just write it after the meeting instead of during it. I listen, and I ask about them more than about their projects, since the project status is already in the tools anyway. I try to end on something upbeat and personal, like what they're up to this weekend. And I keep a running list of the things each person does that makes them happy: a dance class, playing cards with friends, a show they're going to see. It sounds small, but it's exactly the stuff I used to skip right past when I was busy collecting data.

That's where the hours the tools give back go now. To people, not to another meeting.

Management AI After the Org Chart
← Older
People Debt: Recognition